Events archive
Litgrid, Augstsprieguma tīkls, and Elering, the Baltic States electricity transmission system operators (TSOs), have launched the Baltic balancing capacity market. The new market will ensure reserve capacity needed for system balancing and frequency management after Baltic States power systems disconnect from Russia controll…
AS "Augstsprieguma tīkls", Litgrid AB, Elering AS (Baltic TSOs) have jointly developed the necessary proposals for the establishment of the Baltic balancing capacity market and have already informed in advance about the intention to launch the Baltic balancing capacity market in February 2025.
The first auction of the…
On 9 January 2025, exactly a month before the Baltic States join the European energy system (synchronisation), the first synchronous condenser station in Latvia was connected to the power transmission grid. It is one of one nine stations in the Baltics that will maintain a stable frequency to ensure the reliability of the ene…
In February 2025, the energy systems of the Baltic States will disconnect from Russia's energy system and join the energy system of continental Europe, which is three times bigger than Russia's energy system in terms of power generated. This is the largest energy independence and, at the same time, regional security project i…
AS "Augstsprieguma tīkls" together with the other Baltic TSOs – Litgrid AB and Elering AS, and the TSOs of the Baltic Capacity Calculation Region (CCR) have jointly developed proposals necessary for the establishment of the Baltic Balancing Capacity Market:
- Baltic Balancing Capacity Market Rules in accordance w…
To further enhance the efficiency of Latvia’s transmission system operator JSC “Augstsprieguma tīkls” (AST), its shareholder – the Ministry of Climate and Energy – has decided to further reduce the number of supervisory board members. While AST’s statutes permit a five-member supervisory board, the current four-member structu…
