- All National Regulatory Authorities of Baltic countries have assessed and approved the rules for the calculation and allocation of cross-border capacities with the third countries. “Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation with the 3rd Countries” will apply from 1 February, 2019.The Rules were developed by the Baltic transmission system operators (TSOs) Litgrid, Augstsprieguma tīkls and Elering.
- Technical requirements of electrical energy accounting for transmission network users. The requirements provide information about electrical energy accounting for users connected to the Latvian transmission network.
- Methodology for network transfer capacity calculations approved in the BRELL Committee, October 19, 2004
- Instructions for work organizing in AST electrical switchyards and its protection zones - the regulation determines common requirements for contractors working in AST switchyards and its protection zones. The regulation requirements are necessary to arrange relations between AST and contractors for different functions preparing with contractor resources.
- Work instructions for companies contracted by AST – this instructions include information for contractors about AST integrated quality management system, environmental, labor safety and professional health.