Synchronisation of the Baltic States: a first technical study

Market

On Friday 29 September 2017 representatives of 4 TSOs (PSE, Litgrid, AST and Elering) had a meeting in Konstancin-Jeziorna to start the Project of dynamic study identifying technical conditions of the Baltic States’ synchronization with the system of the Continental Europe.

With this meeting the Project has started, and the composition of the Steering Committee and Expert Group was agreed. It is expected that the results will be available by Spring 2018. ENTSO-E representative took part in the meeting and ENTSO-E will be fostering the Project.