image/svg+xml
MW
MW
MW

Existing 330kV lines

Planned 330kV lines

Moving energy
High voltage power transmission and servicing the 330kV and 110kV power transmission lines in the Territory of Latvia.

The physical flows of electricity shown on the map are technical transit flows that enter the power system across one border and leave the power system across another border. Technical transit flows are not an indicator for commercial supplies.

Existing 330kV lines

Events
News

Due to the development of the new version of the Domain Protocol for Latvia, mandatory accreditation of the auditor will be determined in the new field "Validation of electricity production unit…

Development

In order to reduce carbon dioxide emissions and move towards the goal of a climate-neutral energy system, as well as so that investments in the development of the electricity system do not create…

News

The leaders of Baltic Sea Transmission system operators met in Tallinn on 28 June to discuss electricity adequacy of the region. Disruptions of gas deliveries and suspended electricity trade with…

Development

AST, Elering, Litgrid and PSE, the electricity transmission system operators (TSOs) of the Baltic countries and Poland, signed the grant agreement with the European Climate, Infrastructure and…

Development
Management and development of the Latvian transmission system and its integration into the European energy system.
Services
We provide all market players with equal access to the transmission network and with transmission services according to the defined transmission service rates.
Technical expertise and diagnostics
Diagnostics and expertise of technical condition and characteristic values of the electric safety means, power systems and electrical equipment, environmental parameter testing.
Connections to the transmission system
Arranging system connections for electricity Users and Producers. Increasing the permitted load of existing connections.
Balancing and other ancillary services
Balancing and other ancillary services
System use, Balance and Balance service agreement templates and relevant terms and conditions. Information on imbalance administration costs
Requesting EIC
Granting and issue of energy identification codes.