image/svg+xml
MW
MW
MW

Existing 330kV lines

Planned 330kV lines

Moving energy
High voltage power transmission and servicing the 330kV and 110kV power transmission lines in the Territory of Latvia

Existing 330kV lines

Planned 330kV lines

Events
Development

The State Office of Construction Control has commissioned the newly built 330 kV electricity transmission line from Riga CHP-2 to Riga HPP, as well as the reconstructed sections of the existing…

Market

Ensuring the stability of the electricity market, the Latvian-Russian border for electricity imports from Russia to the Baltics will be opened on the 5th of November. The decision was made taking…

Market

The Council of the Public Utilities Commission (PUC) of Latvia on 29th October 2020 has expressed support for the Baltic transmission system operator - AST, Elering AS and Litgrid AB submitted by…

Development

According to the ten-year development plan for the Latvian electric power system approved by the Public Utilities Commission (PUC), within the period between 2021 and 2030 the Latvian electric…

Development
Management and development of the Latvian transmission system and its integration into the European energy system.
Services
We provide all market players with equal access to the transmission network and with transmission services according to the defined transmission service rates.
Technical expertise and diagnostics
Diagnostics and expertise of technical condition and characteristic values of the electric safety means, power systems and electrical equipment, environmental parameter testing.
Connections to the transmission system
Arranging system connections for electricity Users and Producers. Increasing the permitted load of existing connections.
Balancing and other ancillary services
Balancing and other ancillary services
System use, Balance and Balance service agreement templates and relevant terms and conditions. Information on imbalance administration costs
Requesting EIC
Granting and issue of energy identification codes.