Events archive

Events
Market

The Baltic TSOs plan to launch a common Baltic balancing market by 2018. As a prerequisite, the Baltic countries must harmonize and adopt a common set of imbalance settlement arrangements beforehand. The goal is to develop unified, transparent conditions to all market participants which should in effect level the playing fiel…

Development

In the procurement procedure announced by the “Augstsprieguma tīkls” AS for design and construction works of Stage 3 of high voltage line “Kurzemes loks” /The Kurzeme Ring/ the right to sign the contract was obtained by the association of entities “LEC, RECK and Empower”, which had offered to perform the above referred works…

News

All National Regulatory Authorities of Baltic countries have assessed and approved the rules for the calculation and allocation of cross-border capacities within Baltic countries and with the third countries. “Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic S…

News

The European Commission adopts a list of 195 key energy infrastructure projects - known as projects of common interest or PCIs – which will help deliver Europe’s energy and climate objectives and form key building blocks of the EU’s Energy Union. Latvian transmission system development projects included in this list can be fo…

News

The purpose of the review is to compare the development policy of power plants using renewable energy sources (RES) in three Baltic countries: 20-20 targets set in Lithuania, Latvia and Estonia, the current measures for the spur of RES integration and the requirements and conditions for the RES integration into the power syst…

News

As part of the 2016 edition of the ENTSO-E’s (European Network of Transmission System Operators for Electricity) 10-year network development plan (TYNDP)