Existing 330kV lines
The physical flows of electricity shown on the map are technical transit flows that enter the power system across one border and leave the power system across another border. Technical transit flows are not an indicator for commercial supplies.
Existing 330kV lines
As of January 2018, JSC "Augstsprieguma tīkls" alongside the other Baltic transmission system operators (TSOs) operate in a common model for balancing of power systems of Latvia, Estonia…
The green transformation of the European Union is moving society towards a modern and competitive economy, to achieve the climate neutrality goals in 2050. With the significant increase of the…
On January 21, 2021, JSC "Augstsprieguma Tīkls" together with the other Baltic transmission system operators (TSOs) prepared and published the Baltic Load-Frequency control block (LFC block)…
An agreement is signed on a project of critical importance for the safe management of the Latvian power system – the construction of the Dispatch Control and Data Centre “Jāņciems” and…