Studies and reviews

The feasibility study on the isolated operation of the Baltic States has been finalised by the end of August 2017. The study has been ordered by Litgrid, AST and Elering, the electricity transmission system operators of respectively Lithuania, Latvia and Estonia, and prepared by the...

In the spring of 2017 European Join research center has finalised the study “Integration of the Baltic States into the EU electricity system: A technical and economic analysis”. Upon investigating possible technical and economic scenarios on de-synchronizing the networks of Baltic...

The purpose of the review is to compare the development policy of power plants using renewable energy sources (RES) in three Baltic countries: 20-20 targets set in Lithuania, Latvia and Estonia, the current measures for the spur of RES integration and the requirements and conditions for the...

The feasibility study on the interconnection variants for the integration of the Baltic States to the EU internal electricity market  has been accomplished. The study has been ordered by Litgrid , Augstsprieguma tikls and Elering – electricity transmission system operators...