News and Events
On January 21, 2021, JSC "Augstsprieguma Tīkls" together with the other Baltic transmission system operators (TSOs) prepared and published the Baltic Load-Frequency control block (LFC block) concept, which described plans for establishing and implementation of methodologies and processes necessary for operation of Baltic LFC…
On January 21, 2021, JSC "Augstsprieguma Tīkls" together with the other Baltic transmission system operators (TSOs) prepared and published the Baltic Load-Frequency control block (LFC block) concept, which described plans for establishing and implementation of methodologies and processes necessary for operation of Baltic LFC…
AS "Augstsprieguma tīkls" (hereinafter - AST), Litgrid AB and "Elering" AS (hereinafter - Baltic TSOs), in accordance with Commission Regulation (EU) 2017/2195 of November 23, 2017, establishing guidelines on electricity balancing (hereinafter - EBGL) Article 62, jointly submitted a derogation request from the set deadline…
As of January 2018, JSC "Augstsprieguma tīkls" alongside the other Baltic transmission system operators (TSOs) operate in a common model for balancing of power systems of Latvia, Estonia and Lithuania. To ensure this, the common Baltic coordinated balancing area (Baltic CoBA) was introduced and…
TSOs of Baltic Capacity Calculation Region (CCR) have revised the proposal for amendments of the market-based methodology of cross-zonal capacity allocation for the exchange of balancing capacity or sharing of reserves, in accordance with Article 41 of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a…
On January 21, 2021, JSC "Augstsprieguma Tīkls" together with the other Baltic transmission system operators (TSOs) prepared and published the Baltic Load-Frequency control block (LFC block) concept, which described plans for establishing and implementation of methodologies and processes necessary for operation of Baltic LFC…